Seven core service lines, plus the smaller jobs that come with almost every renovation or clearance. If it involves a hammer, a breaker or an excavator, we handle it.
Cabin, partition, ceiling and full interior strip-out for commercial units.
View Service →Full structure take-down for independent houses and old buildings.
View Service →Old plaster and POP removal back to base, ready for re-plastering.
View Service →These come up on almost every site — ask us to fold them into your main quote.
Boundary and compound wall removal ahead of re-fencing or plot clearance.
Internal or external RCC staircase breaking for redesign or removal.
Gypsum, POP and grid ceiling strip-out for offices and homes.
Full floor and wall tile, marble or granite stripping down to base.
Precision slab and beam cutting for openings, staircases and services.
Draining, breaking and filling of disused pools and water features.
We size the crew and machinery to the job — a single chipping job doesn't get a full excavator crew, and a structural job doesn't get under-resourced.
Plaster chipping, one wall opening, a bathroom floor. Usually done same-day with a 2–3 person crew.
Complete apartment interior or office strip-out. Typically 2–4 days with a full chipping crew.
Independent house or building take-down. Machinery-led, permit-aware, 5–10+ days.
Independent houses, villas and individual flats undergoing renovation.
Offices, retail units and co-working spaces ahead of a fit-out or lease change.
Gated communities, shared amenities, overhead tanks and common-area work.
Plot clearance and existing structure removal ahead of new construction.
Debris is segregated on site rather than hauled out as one mixed load — it disposes of cleaner and lets recoverable material like steel be handled separately.
Every job is priced after a site visit. These ranges exist to help you budget roughly — your actual quote depends on area, access, wall type and how much debris there is to haul.
| Job Type | Typical Scale | Rough Guide |
|---|---|---|
| Wall plaster chipping | Per room | Low — priced per sq ft |
| Wall / floor chipping | Per room or per opening | Low to moderate — depends on area & material |
| Apartment interior demolition | Full 1–3BHK | Moderate — scoped after site visit |
| Office strip-out | Per floor | Moderate to high — depends on sq ft & fit-out complexity |
| Water tank demolition | Per tank | Moderate — depends on capacity & access |
| Full building demolition | Per plot | High — depends on built-up area & access |
Apartment Demolition + Wall Plaster Chipping + Floor Chipping, scoped as one job.
Building Demolition + Compound Wall Demolition + Water Tank Demolition ahead of new construction.
Office Demolition + False Ceiling Removal + Floor Chipping before a new interior design goes in.
As a rule of thumb: if the structure itself is coming down, it's demolition. If you're removing a surface (plaster, tile) or cutting an opening in an existing wall, it's chipping. Most renovation jobs are a mix of both, and we scope it as one job either way.
Yes. We run specialist teams for each, but they're coordinated as one project so you get a single quote and a single point of contact.
No. Labour, machinery and haulage are all run by our own teams, so the crew that visits your site is the crew that does the work.
Most people don't know whether their job is "chipping" or "demolition" until we look at it. WhatsApp us a few photos and we'll tell you exactly what's involved.
Free site visit · Same-week quote · Crews across Bangalore