Renovating a flat means working inside someone else's building — shared lifts, fixed work-hours, and neighbours on the other side of the wall. We plan every apartment demolition around RWA timing rules, protect the lift and staircase, and keep dust and noise contained to your unit.
We help you time the work around RWA rules on hours, lift use and debris movement.
Lift, staircase and lobby floor protected before any material moves through them.
Interior walls, tiles and fittings broken down room by room with dust sheeting in place.
Rubble bagged for lift-safe transport and hauled out same day.
Every site is different, so we quote after a site visit rather than a flat rate over the phone. These are the main factors:
| Flat size (1BHK / 2BHK / 3BHK+) |
| Extent of demolition (partial vs full interior) |
| Floor number and lift access |
| Society debris-movement timing |
| Structural wall involvement, if any |
Send us your site details — we'll call back with a scope.
We assess every wall before quoting. Structural walls are only touched with proper engineering sign-off; we'll flag this during the site visit.
Rubble is bagged in society-approved bags and moved via lift or staircase within your building's approved timing.
Typically 2–4 days depending on scope, access and society working-hour restrictions.
Most jobs are billed on completion for small work, or in milestones for larger structural jobs; a deposit may apply for jobs requiring machinery mobilisation. This is agreed upfront in the written quote.
Free site visit · Same-week quote