Re-flooring only works if the old surface comes off cleanly. We chip tile, marble, granite or old screed down to the slab without cracking it, sort the debris, and leave the floor ready for waterproofing or a new laying bed.
We check tile/screed thickness and slab condition before starting.
Doorways and adjoining rooms sheeted off to contain dust.
Flooring removed in sections down to the base slab using hand breakers.
Debris cleared, slab swept and left ready for waterproofing or new flooring.
Every site is different, so we quote after a site visit rather than a flat rate over the phone. These are the main factors:
| Floor area (sq ft) |
| Flooring type — tile, marble, granite, screed |
| Thickness of the laying bed |
| Bathroom / wet-area waterproofing removal |
| Access for debris removal |
Send us your site details — we'll call back with a scope.
No, we chip in controlled sections and stop at the slab — the base structure isn't disturbed.
Yes, this is common ahead of re-waterproofing and re-tiling a bathroom or balcony.
As a rough guide, a 100 sq ft tiled floor produces several hundred kilos of debris — all of it is bagged and hauled off site.
Most jobs are billed on completion for small work, or in milestones for larger structural jobs; a deposit may apply for jobs requiring machinery mobilisation. This is agreed upfront in the written quote.
Free site visit · Same-week quote